Barossa Duplex

Home Dimensions

Unit One Total: 184.8 sqm
Unit Two Total: 195.2 sqm
TOTAL SIZE: 380.0 sqm
Lot Width Required : 22.0 m
Lot Length Required: 40.0 m

Features

3 2 2

Barossa Duplex Floor Plan

About the Barossa Duplex

  • 3 Bedrooms.
  • 2 Bathrooms.
  • Gourmet kitchen with 900 with appliances.
  • Separate living and dining areas.
  • Study nook with built in desk.
  • Raked ceiling through the dining/kitchen area.
  • Formal entry.
  • Double lock-up garage.
  • Covered alfresco area under main roof.
  • Use of different external materials to achieve maximum street appeal.

The Barossa has been designed to suit a sloping corner allotment with maximum street appeal. See the inclusions for details.

Duplex approvals will need to be obtained from the local authorities. A corner Lot is required.

Pricing

Please call us for details regarding pricing.

Sales Contact: Shane Taylor - 0438 877 928

Airconditioning
Ceiling Fans
Dishwasher
Lights
Safety Screen
Vertical Blinds
Driveway
Full Turf
Gravel
Letterbox
Timber Fencing including return
Timber Fencing including return

Features
  • Separate Living & Dining.
  • Built in Pantry.
  • Dishwasher.
  • Quality Stainless Steel appliances.
  • Overhead cupboards.
  • Alfresco under main roof.
  • Built in robes to all bedrooms.
  • Lever door furniture.

The Process From Here

Week 0Contract Signing and Acceptance

After your initial deposit has been received, contracts will be raised for signing. Once you have signed and returned the contracts with ALL of the other supporting documentation, the builder will sign in acceptance. A full copy of the builders accepted contracts will then be sent back to you, copy to your lender on request

Week 2-3Soil Test and Site Survey

These items will be ordered once you have UNCONDITIONAL finance approval OR have authorised K.D. Groom Homes to proceed with the works.

Week 4-6Drafting and Working Plans

Your full working drawings will be ordered once we have received your soil tests, site surveys and UNCONDITIONAL finance approval.

Week 7-8Engineering

After receiving the working drawings the slab design will be prepared by the relevant engineers.

Week 12-13Council Approval

After the slab design is received, all required information is sent to council so a building approval can be obtained. NO work can commence until the building and plumbing approvals have been received by the builder. This is for a house not a duplex.

Week 13+Commencement of Work

The builder will occupy the site within 20 days of receiving ALL building approvals.